Solar + Storage Rebate (Homeowner Solar)
Solar: LMI $1.80/W DC (max $5,000 or 60% cost). Non-LMI with utility incentive: $0.20/W DC (max $5,000 or 40% cost). Non-LMI without utility incentive: $0.50/W DC (max $5,000 or 40% cost). Storage (paired with solar): $300/kWh (max $2,500 or 40/60% cost). Total max $7,500.
Homeowners can get up to $5,000 off a new solar PV system through an ODOE-approved contractor. Low and moderate-income households qualify for higher per-watt rates.
Guidance
The Oregon Department of Energy (ODOE) provides a rebate of up to $5,000 for homeowners installing a new solar PV system. The rebate is applied as an upfront discount by an ODOE-approved contractor, and low- to moderate-income households may qualify for higher per-watt funding rates.
Homeowner Tasks
- Hire an ODOE-approved contractor
You must use a contractor specifically approved by the Oregon Department of Energy to be eligible for this rebate.
- Confirm your household income level
Determine if your household is at or below 100% of the Oregon State Median Income to see if you qualify for higher per-watt rates.
- Verify the upfront discount
Ensure your contractor applies the rebate amount directly as a discount on your final installation invoice.
Contractor Tasks
- Verify ODOE-approved status
You must be an actively approved contractor with the Oregon Department of Energy to offer and process this rebate.
- Submit a pre-enrollment application
You must successfully reserve project funds prior to starting any construction.
- Apply the upfront discount
Pass the entire approved rebate amount to the customer as a clear upfront discount on their invoice.
Qualification
- Has income-qualified portion
Higher $/watt rate and higher percentage cap for Low- and Moderate-Income (LMI) households (at or below 100% Oregon State Median Income).
- Pre-approval required
- Contractor enrollment required
Contractors must be ODOE-approved. Check ODOE site for contractor registration.
Not required: energy star certified equipment · ahri matched pair · income-qualified · permit required · fuel switching required
Important Dates
- Program runs:
- June 15, 2026
Budget & Availability
- May 5, 2026Funding is currently open.
How to Submit
The rebate is passed to the customer as an upfront discount. The approved contractor must reserve the funds before construction starts.