The Potomac Edison CompanyMDrebate

Potomac Edison Switch-to-Electric (HVAC / HPWH)

Rebate amount
Up to $4,000

Equipment: cold-climate HP up to $4,000; ASHP up to $3,500; ductless HP $3,000; HPWH up to $2,500. Lower dual-fuel/partial switching tiers must be confirmed. Separate eligible make-ready up to $3,000 per address. Meredith's 2026-10-12 filing evidence reports $500 Trade Ally bonus once/address, paid to contractor, not homeowner savings. Max $4,000 is equipment only; do not automatically add make-ready or contractor bonus to quote.

Active Potomac Edison Maryland residential customer; replace fossil-fuel equipment through participating HVAC contractor. Direct HVAC/HPWH pathway does not require a $100 home energy audit. Home Performance audit pathway is separate. Official public HVAC and Switch pages verify amounts and eligibility; detailed OneRing checklist, 90-day window, Manual J/ductwork make-ready, and $500 contractor bonus are Meredith's firsthand 2026-10-12 evidence (https://resolvrebates.slack.com/archives/C0ANWQ9CYJ3/p1791827005299779), not publicly verified contractor-guide facts.

residentialsingle familymulti familytownhousecondo

Qualification

  • Energy Star certified equipment
  • Contractor enrollment required

    Participating Potomac Edison Trade Ally/HVAC contractor and OneRing access.

  • Fuel switching required

    Convert existing natural gas, oil or propane heating/water heating to eligible electric heat pump/HPWH; hybrid/partial switching earns lower incentives. Exact dual-fuel tier must be confirmed with administrator.

Not required: ahri matched pair · income-qualified · has income-qualified portion · pre-approval required · permit required

Paid to:Contractor
Stackability: Standard Potomac Edison rebate and Switch-to-Electric cannot both be claimed for the same system (Meredith 2026-10-12 program-document evidence). Equipment and eligible make-ready are distinct; $500 Trade Ally bonus is once/address and paid to contractor. No guaranteed summed award.

Important Dates

Program runs:
December 31, 2026

How to Submit

Participating contractor files through OneRing. Install by 2026-12-31 while funds last. Submit within 90 days of install per Meredith program-document review; confirm annual final cutoff in OneRing. No blanket $100 audit for direct HVAC/HPWH. Preserve existing Switch claims on legacy #8066; new claims use this separate record.

Program Resources

  • The Potomac Edison CompanyMD
ResolvRebate data powered by Resolv

Information is provided for reference only and may not reflect the most current program details. Always verify with the program provider before making decisions.